Lahore Pollution Reduction
Air Quality Index (AQI)
- Current Status:
- Lahore’s AQI is 224.
- While not healthy, it is calmer compared to Gujarat.
Court Orders to Address Pollution
- The Lahore High Court has ordered the demolition of polluting industries.
- Investigations are ongoing to monitor actions taken against these factories.
Role of the Environmental Protection Agency (EPA)
- Purpose:
- EPA was established to control and minimize pollution.
- Current Focus:
- Efforts are underway to evaluate its effectiveness and actions.
Tour of Wagah Town
Factory Observations
- Numerous factories are located in Wagah Town.
- Specific Observation:
- Thick smoke was seen coming from a factory producing tubewell parts.
- Excessive smoke has turned the roof black.
Communication with Employees
- Insights from Workers:
- A worker, Muhammad Iqbal, confirmed they manufacture tubewell parts.
- Employees admitted the smoke is damaging Lahore’s air quality.
- They continue working due to financial constraints.
Request for Government Assistance
- Employees suggested the government should compensate them for ceasing operations to sustain their families.
Conditions Inside the Factory
Observations Inside
- A large fire was emitting significant smoke.
- The smoke rises to the roof and disperses across the area.
Discussions with Staff
- Workers directed questions to the factory owner or clerk.
- Owner’s Status:
- Located on Brant Road but was unavailable.
- Clerk’s Response:
- Refused to collaborate or comment.
Reporting to EPA’s Anti-Smoke Team
Complaint Lodged
- Helpline Contact:
- Complaint made via helpline 1373.
- Details Provided:
- Location: Wagah Town, Lahore.
- Factory Name: Al Sheikh Foundry.
- Specific Area: Near Andu Chowk, Mominpura.
Response from EPA’s Anti-Smoke Team
- Quick Action:
- Team arrived within 3-4 minutes due to proximity.
- Inspector and Deputy Director were present along with other officials.
Inside the Factory with EPA
Actions Taken
- The EPA inspected the furnace emitting the smoke.
- Observations:
- No pollution control device was installed.
- Operations were running secretly.
Immediate Measures
- The factory was sealed, and operations were halted until November 24.
- A fine was imposed for non-compliance.
EPA’s Broader Actions
Recent Inspections and Penalties
- In the past two months:
- Inspections Conducted: About 50 factories.
- Sealed: 150 industries.
- Fines Imposed: 10–15 million PKR.
- FIRs Filed: Against 50 repeat violators.
Current Lockdown Orders
- All brick kilns and furnaces have been ordered to shut down until November 24.
Conclusion
- The factory was sealed and officially marked as non-operational.
- EPA continues efforts to enforce regulations and ensure factories install proper pollution control systems.
Note: Tape seals were applied to ensure the factory remains non-operational.